China Integrated Water Level Monitoring System - China Supplier
China Integrated Water Level Monitoring System - China Supplier

Integrated Water Level Monitoring System

Chemicals/Chemical Machinery/Papermaking Testing Instruments


Contact Info

Wuhan Zhongdi Hengda - Integrated Water Level Monitoring System


(1) System Introduction

The integrated mud and water level monitoring system is suitable for automated measurement of mud level and water level, and can also be used for water level measurement of rivers, reservoirs and dams. The monitoring station has large-capacity storage function, supports multiple communication interfaces, and is applicable to application fields such as national land geological disaster, mine geological disaster, water conservancy and hydropower monitoring. The monitoring station adopts an integrated design, integrating the sensors required for mud and water level monitoring, data acquisition, data transmission, solar power supply,立杆支架 and other components into one, making field installation simple and convenient.

(2) System Features

1) Supports sending data in different protocol formats to 3 or more addresses;

2) Auto-recovery after disconnection, and automatically re-sends unsuccessfully sent data after network recovery;

3) Optional synchronous monitoring of battery/solar voltage, charge and discharge information, temperature and humidity, signal strength, location information, etc.;

4) Supports multiple working modes: sleep mode, online mode, early warning mode;

5) Has threshold trigger function, and automatically reports immediately when monitoring data exceeds the threshold;

6) Can store data for more than 2 years, with the function of automatically overwriting old data;

7) Remote control, online upgrade of hardware programs;

8) Non-contact measurement, convenient installation, very low maintenance;

9) Less affected by terrain during installation, measurement can be carried out as long as the bracket is properly set;

10) Radar wave has small beam angle, extremely low transmitting power, concentrated energy, stronger anti-interference ability, greatly improving measurement accuracy and reliability;

11) The monitoring station has strong corrosion resistance and rust resistance, and temperature, freeze-thaw, rain, dust, strong wind, etc. will not affect the normal operation of the equipment system.

(3) Technical Parameters

Measurement Range

0.6~40m

Resolution

1mm

Accuracy

±3mm

Operating Temperature

-30℃~80℃

Adaptable Water Level Change Rate

Not less than 100cm/min

Average Service Life

≥ 30000h

Blind Area

0.5m

Power Supply Mode

Solar energy, battery, mains electricity

Protection Grade

IP67

Communication Protocol

Technical Requirements for Geological Disaster Monitoring Communication

(4) System Configuration

Serial No.

Name

Description

1

Radar Level Gauge

Used to measure mud and water level

2

Digital Signal Collector

Used for data acquisition and storage

3

GPRS Antenna

Used for data transmission

4

Solar Panel

100W (adjustable according to actual conditions, can also be replaced by mains power supply)

5

Battery

65Ah maintenance-free battery (adjustable according to actual conditions)

6

Charge Controller

Protects the battery and prevents overcharging; 12V/24V 20A

7

Buried Box

Houses the equipment and provides protection

8

Integrated Installation Bracket

Stainless steel galvanized steel pipe, 3 meters (adjustable according to actual conditions)

9

Cloud Platform

Data display, export, early warning




Chemicals/Chemical Machinery/Papermaking Testing Instruments
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192
ChatGlobal TChat